Engineered concrete panel homes built for durability, energy efficiency, and lasting value — delivered in 45 to 65 days.
GMBH Insulated Cement Panels (ICP) are load-bearing structural wall panels — a precision-engineered system of galvanized steel frame, EPS insulation core, and fiber cement board, certified under TER 2302-01 by DrJ Engineering and compliant with the Florida Building Code.
Integrated insulation dramatically reduces HVAC demands, and the system's durability means fewer replacement constructions over time.
Panels are manufactured with low carbon-impact materials, generating up to 30% less construction waste than traditional methods.
Two different goals — one exceptional system
You don't have to navigate financing alone. MY ECO CONSTRUCTION has established relationships with experienced local lenders and real estate professionals who understand new construction in Florida — so you get guidance from the lot search all the way to closing.
Our streamlined 5-step process eliminates uncertainty and keeps you informed at every stage.
Reach out to schedule a consultation. We'll walk you through the models, the process, and what to expect — no pressure, just information.
* Prices listed are starting prices for construction only and do not include land acquisition.
Final pricing may vary based on lot location, site conditions, selected finishes, and applicable permits.
Land cost is separate and varies by market — typical lot acquisition ranges from $30,000–$45,000 depending on location.
Contact us for a complete all-in project estimate tailored to your specific lot and requirements.
All figures are projections and not a guarantee of final cost.
** Build times referenced above (45–65 days) refer exclusively to the structural assembly phase and assume that all permitting has been approved, the concrete slab is complete, rough plumbing is in place, and all materials are on-site at the start of construction. Actual total project timeline from lot acquisition to move-in will vary based on permitting timelines, site conditions, and local municipality requirements.